Tandem Head Office Melbourne - Site proiect public
-
23rd septembrie 2025, Relocation- Male & Female Toilets from Central Tower to South Tower
Toilets relocated to South Tower
Level 01- Male Toilet,
Level 02- Female Toilet -
19th septembrie 2025, Main Toilet Block lunchroom carpark area water outage
Please use site office toilets, and pipe will be reconnected tomorrow morning
-
01st mai 2024, South Building power shut down
South Building temp power boards from level 3 up to 10 will be isolated today for 1 hour to change over the RCD’s from 10am to 11am
Condiții meteo curente la șantier
Ultima actualizare la: 11:31
Temperatură: 23C (Aplicație 20C)
Viteza vântului: 22KMH
Max. Vânt: 24KMH @03:21
Ploaie de la 9 AM: 0,0mm
Temp min: 18C @03:58
Temp max: 26C @18:09 15.01.2026
Rafală: 41KMH
Rafală max: 41KMH @11:31
Locație observație - Melbourne (Olympic Park), VICTORIA
Fus orar - Ora standard a Australiei Orientale
Prognoză - vineri, 16 ianuarie
Partly cloudy.
Min: 17C Max: 25C
Șanse de ploaie: 30%
Precipitații așteptate: 0 la 1mm
Locație prognoză - Melbourne, VICTORIA
Fus orar - Ora standard a Australiei Orientale
Mâine - sâmbătă, 17 ianuarie
Sunny.
Min: 16C Max: 29C
Șanse de ploaie: 10%
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.